This was a challenging Cary Waterfall Installation project located at parkside commons in Cary/Morrisville. The difficult portion of this installation arose because the walls were built without any consideration for the water feature. The location and steepness of the site was also challenging, requiring heavy equipment (exactors) to locate each boulder. This was a risky and time consuming waterfall installation, but came out beautifully. Most of the people involved, including engineers and site managers, had a hard time visualizing how it could be done, but we assured them of the plan and everyone was extremely pleased with the end results.